Geoplast formwork product for EU’s future power network
-
The EU’s future power network is a European electricity distribution grid designed to support electrification, integrate renewable energy, and enhance energy security.
-
Up to 600 billion EUR needs to be invested by 2030 to achieve this transformation.
-
Geotub enables installation in just 10 minutes, accelerating the construction of foundation plinths for the future electricity grid.
EU’s future power network transformation
According to the European Commission’s Study on network development planning, tariff structures and connection requests for electricity distribution grids, most future assets will be connected at distribution level, making decentralisation and decarbonisation of the European energy infrastructure.
Up to 600 billion EUR will be needed by 2030 to achieve the EU’s future energy infrastructure
The EU’s electricity grids are evolving into a highly interconnected network that enables electrification, integrates renewable energy, and strengthens energy security across the continent. To support this transformation, around €600 billion will be required by 2030 to reinforce infrastructure.
Geotub 10-minute installation for faster concrete pours of foundations plinths and electrical infrastructure deployment
Geotub is a reusable recycled plastic formwork ideal for accelerating the construction of foundation plinths for electrical infrastructure projects.
Geotub replaces traditional formwork solutions and can be assembled in approximately 10 minutes, significantly reducing labor time and speeding up construction. Its lightweight, reusable design improves efficiency in repetitive infrastructure works. As a result, Geotub plays a key role in accelerating the delivery of electrical network infrastructure, supporting faster deployment and scalable expansion of power grid foundations.
Learn more