Euralille Biotope, Lille, France

Solutions applied
Products used

Geotub improved worksite efficiency and was chosen as a cost-effective formwork for the construction of the Biotope office building in Lille, France. Our Geotub was the preferred formwork solution for circular columns because the busy construction site never had enough available crane time. Geotub formwork is completely crane-independent, which makes it more efficient than conventional metal formwork and more affordable than expendable cardboard tubes.

Geotub provided multiple benefits:

Biotope Office Building is designed by famous Henning Larsen Architects (Denmark) and Keurk Architecture (Lille). Biotope is a 7-story building with a 30,000 m2 surface, originally planned to be the HQ of the EMA (European Medicines Agency), and later taken over for the government offices of Lille Métropole. Biotope is certified BREEAM Excellent and Well Gold and has a vast green roof surface.

Photo credits: Henning Larsen Architects

Learn more about the advantages of Geotub:
Geotub projects
Bridge and elevated road improvements with Geotub formwork
Geoplast Build Fast reduces building costs by up to 20%
Geoplast light weight plastic formwork benefits
We made five airports more sustainable

//Show ZOHO chat on Geoplast.it English