Berrigan irrigation works, New South Wales
![Berrigan Main Channel after Geopanel](/images/projects/irrigation_main.jpg)
![Geopanel for the gate structure at Berrigan Channel](/images/projects/geopanel_1.jpg)
![Wall structure for water irrigation system](/images/projects/geopanel_3.jpg)
![Geopanel for concrete walls at Berrigan](/images/projects/Geopanl_02.jpg)
![Berrigan Main Channel in NSW](/images/projects/irrigation_1.jpg)
Geoplast Geoplanel was used to complete a replacement of a gate structure on the Berrigan Main Channel, part of the Murray Irrigation Scheme, with walls 2400 mm x 300 to 350 mm thick.
A pressure was mounting to build the concrete walls and gate structure during a limited shut down period between seasons. A fast, adaptable formwork system was required.
Allcon Group, our Australian distributor, designed and delivered 180 m2 of Geoplast Geopanel Wall plastic formwork for concrete to build two “U”-shaped walls with channel returns and wing walls to suit the Rubicon gates.
Using Geoplast plastic formwork meant that the entire structure could be formed and poured in under 5 days.