Terminal 1 Center, San Francisco International Airport, California

Solutions applied
Products used

Restoration of Airport Terminal 1 Center at San Francisco International Airport is part of a $2.4 billion reconstruction project that is going to be completed in several phases from 2016 to 2024. Geopanel was the most suitable solution for reconstruction of the existing building with limited space and difficult approach to structure. It improved sustainable profitability by efficient construction of pile caps and concrete walls, eliminating the need for cranes and other heavy machinery, and reducing waste. 

Our Geopanel was chosen for its benefits:

One of the previous phases included reconstruction and redevelopment of Boarding Area B, where our Geotub was used for the construction of concrete columns.

Reconstruction project of San Francisco International Airport is aiming to receive at least Environmental LEED© Gold certification, by using sustainable construction solutions and processes.

More about the benefits of Geopanel formwork:
Geopanel projects
Geopanel for lean construction
How Geoplast formworks make building more profitable?
Geoplast Build Fast reduces building costs by up to 20%
Geoplast light weight plastic formwork benefits
Since 2005 Geopanel plastic formwork has been reducing costs and improving sustainability

//Show ZOHO chat on Geoplast.it English